Street Closures

Updated 4/25/17 – updated information shown in red
Black Walnut Drive
Beginning April 17, 2017 to allow for work associated with the McKamy Creek Road reconstruction project.  During the construction of the westbound lanes of McKamy Creek Road, Black Walnut Drive will serve only as an entrance to the Oaks of Lake Forest neighborhood.  The closure will allow for the phased completion of the intersection, while still allowing the Flower Mound Fire Department direct access to the neighborhood. The closure of Black Walnut Drive is expected to last approximately 3 weeks, weather permitting.
Colonial Drive
Beginning January 23, 2017 to allow for utility work associated with the Colonial Drive Reconstruction project.  Colonial Drive, between Colony and Homestead, will be closed in the immediate work area between the hours of 7 am and 7 pm.  The work is scheduled to be complete May 19, 2017, weather permitting.
Forest Vista Drive
The eastbound lanes of Forest Vista Drive, between Lakeshore Drive and FM 2499, are reduced to one lane until the Forest Vista Drive Reconstruction project is complete.  There will be continuous access to neighborhoods and schools; however detours will be required while work is performed at neighborhood entrances.  Construction is scheduled to be complete May 2017. 
Gerault Road
Beginning April 24, 2017 to allow for work associated with the Advantage Storage development.  There will daily northbound (right lane) and southbound (left lane) lane closures, from Spinks Road to just south of Lakeside Parkway, between the hours of 9 am and 3 pm.  Work is expected to be complete May 26, 2017.
Kales Lane
Beginning April 27, 2017 to allow for street repairs. The eastbound lane of 3613 Kales Lane will be closed and is scheduled to be complete May 4, 2017.  
Lakeside Parkway
Beginning August 6, 2016 to allow for road reconstruction work associated with the Lakeside DFW project.  Lakeside Parkway will be reduced to two lanes (one single lane in each direction) between Sandy Lane and Edgemere Road.  This project is expected to be complete by June 2017 – expect traffic delays during peak traffic hours.
McKamy Creek Road
Beginning January 9, 2017 to allow for work associated with the McKamy Creek Road reconstruction project.  McKamy Creek Road, from Flower Mound Road to Woodhill Drive, will be reduced to two lanes (one each direction).  Additionally, the left turn from westbound Flower Mound Road to McKamy Creek Road will be reduced to a single lane.  This work is scheduled to be complete May 2017, weather permitting.
River Bend Court
Beginning May 1, 2017 to allow for street repairs. The eastbound lane of River Bend Court will be closed and is scheduled to be complete May 8, 2017.  Upon completion of the eastbound lane, the westbound lane of River Bend Court will be closed and the work is scheduled to be complete May 15, 2017.
Stonecrest Road
Beginning March 7, 2016 Stonecrest Road will be one way northbound, from Canyon Falls Drive to Ridgecrest Street.  Southbound traffic will be detoured to US Hwy 377.  Work is expected to be complete April 2017.
Timber Valley Drive
#1 – Beginning May 1, 2017 to allow for street repairs. The southbound right lane of Timber Valley, at FM 1171, will be closed and is scheduled to be complete May 8, 2017.  Upon completion of the southbound right lane, the southbound left lane of Timber Valley, at FM 1171, will be closed and the work is scheduled to be complete May 15, 2017.
#2 – Beginning May 3, 2017 to allow for street repairs. The southbound lane of 1004 Timber Valley Drive will be closed and is scheduled to be complete May 11, 2017.  
#3 – Beginning May 3, 2017 to allow for street repairs. The southbound lane of Timber Valley Drive at Summer Trail will be closed and is scheduled to be complete May 11, 2017.  
For more information on the closures, please call 972.874.6310